Fence Materials

Wood fence takeoff from the run length: posts and sections at 6 or 8 ft spacing, rails by style, pickets from width and gap, even-foot post lengths from the 1/3-height bury rule, and per-hole plus total concrete with premix bag counts.


Trade practice · 1/3-height bury, 2 ft min · frost depth per AHJ

Fence Layout

Post bury follows the trade rule of thumb: 1/3 of the fence height, 2 ft minimum. Local frost depth may govern embedment — check your AHJ, and call 811 before digging.

Lumber & Hardware

14
Posts (13 sections)
8 ft
Post length to buy (2.00 ft bury)
39
Rails (3 per section)
219
Pickets
0
Gate hardware sets (hinges + latch)

Post Holes & Concrete

10.5in
Hole diameter (3 x post width)
28in
Hole depth (incl. 4 in gravel base)
1.03ft³
Concrete per hole
14.46ft³
Concrete total (14 holes)
25
80-lb bags (total, buy this)
33
60-lb bags (total)

About 2 x 80-lb bags per hole when mixing post by post. Bag counts are rounded up on the total pour — mixing per hole wastes partial bags.

Total 80-lb Bags: 6 ft vs 8 ft Post Spacing

6 ft spacing8 ft spacing08162432

Closer post spacing stiffens the fence but adds posts, holes, and concrete.

About Fence Calculator (Posts, Rails, Pickets & Concrete)

The fence calculator turns a run length into a complete wood-fence shopping list: line posts and sections, rails, pickets, the post length to buy, post-hole dimensions, and the concrete to set every post. Sections come from dividing the run by the post spacing (6 or 8 ft on center) and rounding up; posts are sections plus one, plus one extra post for each gate. Rails follow the style — three per section for a 6-ft privacy fence, two for a typical picket fence, and two or three (your choice) for post-and-rail.

Pickets are counted from the covered width of one picket plus its gap: a standard 5-1/2 in dog-ear picket butted tight for privacy, or spaced 1-1/2 in apart for a classic picket look. Posts follow the trade rule of thumb of burying one-third of the fence height with a 2-ft minimum, and the buy length is rounded up to even-foot stock (8, 10, 12 ft). Each hole is three times the post width in diameter over a 4-in gravel drainage base, and the concrete takeoff nets out the post itself, reporting per-hole and total volume with 60-lb and 80-lb premix bag counts.

How It Works

  1. Enter the total fence run in feet and pick the style: privacy (3 rails, butted pickets), picket (2 rails, spaced pickets), or post-and-rail (no pickets, 2 or 3 rails per section).
  2. Set the fence height (3-8 ft) and the post spacing, 6 or 8 ft on center. Closer spacing stiffens the fence but adds posts, holes, and concrete.
  3. For picketed styles, adjust the picket width and gap if you are not using standard 5-1/2 in pickets; the count comes from the run divided by one picket-plus-gap pitch.
  4. Add the number of gates. Each gate adds one extra post (a second hinge-side or latch-side post) and one hardware set of hinges and a latch; order gate posts one size heavier where the gate is wide.
  5. Read off posts, rails, and pickets, the even-foot post length from the 1/3-height bury rule (2 ft minimum), the hole size with its 4-in gravel base, and the concrete: per-hole volume, total volume, and 60-lb and 80-lb bag counts ceiled on the total, which is the buy quantity.

Worked Example

The first row of the table below is the classic job: a 100-ft privacy fence, 6 ft high with posts 8 ft on center and 5-1/2 in pickets butted tight, no gates. Sections: ceil(100 / 8) = 13, so 14 posts. Rails: 13 x 3 = 39. Pickets: ceil(100 x 12 / 5.5) = 219. Bury: max(2, 6/3) = 2 ft, so the post is 6 + 2 = 8 ft — already an even stock length, no cutoff waste. Each hole is 3 x 3.5 = 10.5 in across and 2 x 12 + 4 = 28 in deep including the 4-in gravel base. Concrete fills the 24 in above the gravel minus the post: pi x (5.25/12)^2 x 2 - (3.5/12)^2 x 2 = 1.03 ft^3 per hole, 14 x 1.03 = 14.46 ft^3 total. Buy the concrete as one quantity — 25 bags of 80-lb premix (or 33 of 60-lb) — rather than two-bags-a-hole, which would over-buy by rounding at all 14 holes.

How many fence posts, pickets, and bags of concrete do I need?

Material takeoffs for the fence runs people most often quote, all with posts 8 ft on center, no gates, and standard 5-1/2 in pickets — butted tight on the privacy rows (6 ft tall), spaced 1-1/2 in on the 4-ft picket row. The post-and-rail row is 4 ft tall with 2 rails per section, and 80-lb premix bags are ceiled once on the total pour.

FencePostsRailsPickets80-lb concrete bags
100 ft privacy fence, 6 ft tall143921925
150 ft privacy fence, 6 ft tall205732835
200 ft privacy fence, 6 ft tall267543745
300 ft privacy fence, 6 ft tall3911465568
100 ft picket fence, 4 ft tall142617225
200 ft post-and-rail fence, 4 ft tall, 2 rails2650045

Formulas

Sections and posts
sections = ceil(run / spacing); posts = sections + 1 + gates
Rails and pickets
rails = sections x railsPerSection; pickets = ceil(run x 12 / (w + g))
Bury depth and post length
bury = max(2, H / 3); postLength = roundUpEven(H + bury)
Post hole
holeDia = 3 x postWidth; holeDepth = bury x 12 + 4
Concrete per hole and bags
V = [pi x (holeDia/24)^2 - (postWidth/12)^2] x bury; bags = ceil(V x posts / yield)

Standards & References

  • Trade practice -- post bury 1/3 of fence height, 2 ft minimum (rule of thumb, not a code table)
  • Local frost depth may govern post embedment -- check your AHJ before digging
  • Call 811 (US) for utility locates before setting posts

Frequently Asked Questions

How deep should fence posts be set?

The trade rule of thumb is one-third of the fence height with a 2-ft minimum: a 6-ft fence gets 2 ft of bury, an 8-ft fence about 2 ft 8 in. In cold climates the local frost depth often governs instead — a post that stops above the frost line can heave — so check the required embedment with your local building department before digging. The calculator adds a 4-in gravel base below the post for drainage, which is why the hole is dug deeper than the bury.

How many fence pickets do I need per foot?

Divide 12 in by the covered width of one picket — its face width plus the gap to the next one. Standard 5-1/2 in dog-ear pickets butted tight cover 5.5 in each, about 2.2 pickets per foot, so a 100-ft privacy fence needs ceil(1200 / 5.5) = 219 pickets. Spaced 1-1/2 in apart for a picket fence, each covers 7 in and the same run needs only 172. Green pressure-treated pickets shrink as they dry, so butted privacy pickets will open small gaps over the first season.

Should fence posts be 6 or 8 feet apart?

Eight feet on center is the standard bay for wood fences because rails come in 8-ft and 16-ft stock. Six-foot spacing makes a noticeably stiffer fence and is worth it for tall privacy fences in windy sites or where the grade steps frequently, at the cost of roughly a third more posts, holes, and concrete. The calculator charts the 80-lb bag totals at both spacings so you can see the concrete cost of the stiffer layout.

How many bags of concrete per fence post?

For a 4x4 post in a 10-1/2 in hole with 24 in of concrete above the gravel base, the net volume is about 1.03 ft^3 — roughly two 80-lb bags per hole. Buy from the total, not per hole: the total pour divided by bag yield (0.60 ft^3 per 80-lb bag, 0.45 ft^3 per 60-lb) and rounded up once wastes far fewer partial bags than rounding up at every hole. A 14-post privacy run needs about 14.5 ft^3, which is 25 x 80-lb bags bought as a single quantity.

How many rails does a fence need?

Two rails carry a fence up to about 5 ft tall; at 6 ft and above, a third rail keeps pickets from cupping and the mid-span from oil-canning, which is why the privacy style here uses three. Classic picket fences under 4 ft use two. Post-and-rail fences are simply two-rail or three-rail styles by look and stock length, so the calculator lets you choose either for that style.

How many fence posts do I need for 200 feet of fence?

At 8 ft on center, 200 ft is ceil(200/8) = 25 sections, so 26 line posts — the 200-ft rows in the table above — plus one extra post for every gate. Tightening to 6-ft spacing raises it to ceil(200/6) = 34 sections and 35 posts, roughly a third more posts, holes, and concrete for a stiffer fence.

What length fence post do I need for a 6-foot fence?

Using the 1/3-height bury rule with its 2-ft minimum, a 6-ft fence buries max(2, 6/3) = 2 ft, so you need 8 ft of post — conveniently an even stock length. An 8-ft fence buries 8/3 ≈ 2.67 ft, needing 10.67 ft, which rounds up to a 12-ft post. Where frost depth governs deeper embedment, buy the next even length that covers height plus the required bury.

How much concrete for 150 feet of privacy fence?

The 150-ft privacy row above sets 20 posts, each in a 10-1/2 in hole with 24 in of concrete above the gravel base — about 1.03 ft³ per hole and 20.6 ft³ in total, which is 35 bags of 80-lb premix ceiled once on the total pour. That single-quantity rounding is the buy number; per-hole rounding would pay for several extra bags across the run.

What extra material does a gate add?

Each gate adds one extra post — gate openings are framed by two posts, one of which would otherwise be shared with the neighboring bay — plus a hardware set of two or three hinges and a latch. The gate leaf itself is usually built from the same picket and rail stock already counted in the run. For gates wider than about 4 ft, upgrade the hinge post to a 6x6 or steel post and set it in a deeper, wider footing than the line posts.

Optional usage analytics

Allow Google Analytics to measure page visits and calculator feature use? Analytics stays off until you allow it. Your calculators work either way. Change your choice here at any time. Read our privacy policy.